-Predictive and Preventative Maintenance- Do you need it?
Glen Henry ghenry@acmeelectric.com 3353 Southgate Ct. SW Cedar Rapids, IA 52404 Phone: 319.365.8677 Fax: 319.365.0541
Required Information=*
Name: * Title: Company: * Address
City
State
ZipCode
Phone: Fax:
Email: Project Name: *
Other Data
Now please answer a few questions
1. What type facility are you looking for TSD to maintain?
Government Utility Industrial
Commercial Institutional Other
Add your comments...
2. What is the scope of this job?
Maintenance Service
Update and Modernization Other
3. What is the primary voltage to your facility? Please indicate all that apply.
69 KV 34.5 KV 13.8 KV
12.5 KV 4.16 KV Other (please list)
4. What is the secondary voltage inside your facility? Please indicate all that apply
120/240 Single phase 120/208 Three phase
277/480 Three phase Other (please list)
5. Have you had an electrical distribution audit within the past 24 months?
Yes
No
6. Do you currently have a preventive or predictive maintenance program?
7. Who currently performs your electrical maintenance?
Facilities Staff Some of Both
Outside Contractor
8. Which technologies do you currently use in your facility?
Thermography Vibration Analysis Oil Analysis Emergency Generation
UPS Systems Other None of the Above
9. Where do you need help to assure a successful program?
With a preliminary feasibility study With a facility investigation (audit) With a schematic design study and budget Other
10. What special items will be required?
Planning and project management Temporary power during construction Grounding system New or modified service to building(s) Power distribution within the facility Installing new wiring, replacing old wiring Other
11. What areas do you believe you need help with in your electrical maintenance?
Substation Main Switchgear Distribution System Process Equipment
Power Quality Motor Inventory Lighting Survey Other
12. Are any process control or instrumentation systems needed?
Process Control Instrumentation Energy Management
Equipment and Control Cabinets Other
13. What tests and inspections do you need?
Develop Safety Procedure Basic Measurements Electric Installation Equipment and Controls
Quality of Materials Clean Up Completed Project Other
14. What documentation is available on this facility?
One Line Diagram Motor Inventory As Built Drawings
Process Flow Diagrams Other
15. How will the program be budgeted?
Budgeted now, ready to go Need estimate for corporate approval Need help and suggestions for financing Other
16. How will the program be accomplished?
During a scheduled shutdown Anytime by mutual agreement
Other
17. What is the primary business reason for implementing this program?
To remain competitive Prevent sudden power outages Employee Safety Equipment Reliability Increased Productivity Other
18. How soon would you like TSD to begin the electrical audit?
As soon as possible 30 days 60 days
90 days Other
For a free, quick analysis of your electrical maintenance needs, please take a few minutes to fill out the following survey. You don't have to answer every question. Feel free to skip any that don't apply to you. We'll get back to you within 5 working days.